VANCOUVER, BC, April 9, 2025 /CNW/ - Freeman Gold Corp. (TSXV:FMAN) (OTCQB:FMANF) (FSE: 3WU) ("Freeman" or the "Company") is pleased to announce the results of its updated price sensitivity analysis using current market prices completed by Ausenco Engineering Canada ULC ("Ausenco") and Moose Mountain Technical Services ("MMTS"). Updating the pricing used in the October 16, 2023 initial Preliminary Economic Assessment ("PEA") at a base case of US$2,200/oz gold price, based on current long-term consensus forecasts, results in a post-tax Net Present Value ("NPV")5% of US$329 million, a post-tax internal rate of return ("IRR") of 28.2% and a payback of 2.9 years. This analysis quantifies the strong leverage to gold and is a marked improvement over the original base case of US$1,750/oz gold price resulting in a post-tax NPV5% of US$212 million, a post-tax IRR of 22.8% and a payback of 3.6 years. The updated price analysis demonstrates that the Lemhi Gold Project's economics remain strong with significant leverage to the current spot price of US$2,900/oz which results in a post-tax NPV5% of US$648 million, post-tax IRR of 45.9% and a payback of 2.1 years. Figure 1 summarizes the various post-tax NPV5% for gold prices ranging from US$1,750/oz to US$3,400/oz."Significant changes in gold prices over the last 18 months motivated Freeman's reassessment of its initial PEA model over a more fulsome range of scenarios. Using the current spot gold price, the Lemhi Gold Project will have an approximate US$1,871/oz cash margin using the updated all in sustaining cost ("AISC") of US$1,105/oz with significant additional upside at higher prices. The Lemhi Gold Project remains a low capital expenditure ("CAPEX"), low-cost project that is profitable across a range of prices and development options," commented Bassam Moubarak, the Company's Chief Executive Officer. "Furthermore, this updated economic analysis using a US$2,200/oz gold base case further solidifies the after-tax NPV (5%) at US$329 million, a post-tax IRR of 28.2% and reduces the payback to 2.9 years."Updated Economic AnalysisThe updated Economic Analysis is based on the production and mining profile used in the 2023 PEA. Table 1 provides a summary of the production profile along with the updated project price economics.Table 1: Updated Economic Analysis SummaryGeneralUnitLife-of-Mine ("LOM") Total/Avg.Gold PriceUS$/oz2,200Mine Lifeyears11.2Total Waste Tonnes Minedkt121,903Total Mill Feed Tonneskt31,128ProductionUnitLOM Total/Avg.Strip Ratiowaste: mineralized rock3.9Mill Head Gradeg/t0.88Mill Recovery Rate%96.7Total Payable Mill Ounces Recoveredkoz851.9Total Average Annual Payable Productionkoz75.9Operating Costs UnitLOM Total/Avg.Mining Cost (incl. rehandle)US$/t mined2.96Mining Cost (incl. rehandle)US$/t milled13.49Processing CostUS$/t milled10.91General & Administrative CostUS$/t milled1.14Total Operating CostsUS$/t milled25.54Treatment & Refining CostUS$/oz4.3Net Smelter Royalty%1Cash Costs1US$/oz Au925All-In Sustaining Costs2US$/oz Au1,105Capital CostsUnitLOM Total/Avg.Initial CapitalUS$M215Expansion Capital3US$M6.5Sustaining CapitalUS$M105Closure CostsUS$M33Salvage ValueUS$M14Financials – Pre-TaxUnitLOM Total/Avg.Net Present Value (5%)US$M453Internal Rate of Return%33.2Paybackyears2.7Financials – Post-TaxUnitLOM Total/Avg.Net Present Value (5%)US$M329Internal Rate of Return%28.2Paybackyears2.9Full story available on Benzinga.com

VANCOUVER, BC , April 9, 2025 /CNW/ - Freeman Gold Corp. FMAN FMANF 3WU (" Freeman " or the " Company ") is pleased to announce the results of its updated price sensitivity analysis using current market prices completed by Ausenco Engineering Canada ULC (" Ausenco ") and Moose Mountain Technical Services (" MMTS "). Updating the pricing used in the October 16, 2023 initial Preliminary Economic Assessment (" PEA ") at a base case of US$2,200 /oz gold price, based on current long-term consensus forecasts, results in a post-tax Net Present Value (" NPV ") 5% of US$329 million , a post-tax internal rate of return (" IRR ") of 28.

2% and a payback of 2.9 years. This analysis quantifies the strong leverage to gold and is a marked improvement over the original base case of US$1,750 /oz gold price resulting in a post-tax NPV 5% of US$212 million , a post-tax IRR of 22.



8% and a payback of 3.6 years. The updated price analysis demonstrates that the Lemhi Gold Project's economics remain strong with significant leverage to the current spot price of US$2,900 /oz which results in a post-tax NPV 5% of US$648 million , post-tax IRR of 45.

9% and a payback of 2.1 years. Figure 1 summarizes the various post-tax NPV 5% for gold prices ranging from US$1,750 /oz to US$3,400 /oz.

"Significant changes in gold prices over the last 18 months motivated Freeman's reassessment of its initial PEA model over a more fulsome range of scenarios. Using the current spot gold price, the Lemhi Gold Project will have an approximate US$1,871 /oz cash margin using the updated all in sustaining cost (" AISC ") of US$1,105 /oz with significant additional upside at higher prices. The Lemhi Gold Project remains a low capital expenditure (" CAPEX "), low-cost project that is profitable across a range of prices and development options," commented Bassam Moubarak, the Company's Chief Executive Officer.

"Furthermore, this updated economic analysis using a US$2,200 /oz gold base case further solidifies the after-tax NPV (5%) at US$329 million , a post-tax IRR of 28.2% and reduces the payback to 2.9 years.

" Updated Economic Analysis The updated Economic Analysis is based on the production and mining profile used in the 2023 PEA. Table 1 provides a summary of the production profile along with the updated project price economics. Table 1: Updated Economic Analysis Summary General Unit Life-of-Mine ("LOM") Total/Avg.

Gold Price US$/oz 2,200 Mine Life years 11.2 Total Waste Tonnes Mined kt 121,903 Total Mill Feed Tonnes kt 31,128 Production Unit LOM Total/Avg. Strip Ratio waste: mineralized rock 3.

9 Mill Head Grade g/t 0.88 Mill Recovery Rate % 96.7 Total Payable Mill Ounces Recovered koz 851.

9 Total Average Annual Payable Production koz 75.9 Operating Costs Unit LOM Total/Avg. Mining Cost (incl.

rehandle) US$/t mined 2.96 Mining Cost (incl. rehandle) US$/t milled 13.

49 Processing Cost US$/t milled 10.91 General & Administrative Cost US$/t milled 1.14 Total Operating Costs US$/t milled 25.

54 Treatment & Refining Cost US$/oz 4.3 Net Smelter Royalty % 1 Cash Costs 1 US$/oz Au 925 All-In Sustaining Costs 2 US$/oz Au 1,105 Capital Costs Unit LOM Total/Avg. Initial Capital US$M 215 Expansion Capital 3 US$M 6.

5 Sustaining Capital US$M 105 Closure Costs US$M 33 Salvage Value US$M 14 Financials – Pre-Tax Unit LOM Total/Avg. Net Present Value (5%) US$M 453 Internal Rate of Return % 33.2 Payback years 2.

7 Financials – Post-Tax Unit LOM Total/Avg. Net Present Value (5%) US$M 329 Internal Rate of Return % 28.2 Payback years 2.

9 Notes: 1. Cash costs consist of mining costs, processing costs, mine-level G&A and treatment and refining charges. 2.

All-in sustaining costs include cash costs plus royalties, sustaining capital and closure costs. 3. Expansion of mill from 2.

5 million tonnes per annum (" Mtpa ") to 3 Mtpa in year 5 of operation Capital & Operating Costs The updated capital cost estimate conforms to Class 5 guidelines for a PEA-level estimate accuracy according to the Association for the Advancement of Cost Engineering International. The capital cost estimate was developed in Q1 2025 United States dollars based on Ausenco's in-house database of projects and studies, as well as experience from similar operations and escalation of costs from 2023 PEA. The updated estimate includes open pit mining, processing, on-site infrastructure, tailings and waste rock facilities, off-site infrastructure, project indirect costs, project delivery, owner's costs, and contingency.

The updated capital cost summary is presented in Table 2. The updated total initial capital cost for the Lemhi Project is US$214.9 million ; and life-of-mine sustaining costs are US$104.

8 million . The updated cost of expansion in the fifth year of production is estimated at US$6.5 million .

Updated Closure costs are estimated at US$32.6 million , with salvage credits of US$13.9 million .

Table 2: Updated Summary of Capital Cost Work Breakdown Structure WBS Description Initial Capital Cost (US$M) Sustaining Capital Cost LOM (US$M) Expansion Cost (US$M) Total Capital Cost LOM (US$M) 1000 Mine 52.0 63.0 2.

2 117.2 3000 Process Plant 73.5 1.

7 2.7 77.9 4000 Tailings 10.

7 39.9 – 50.6 5000 On-Site Infrastructure 20.

2 0.2 – 20.4 6000 Off-Site Infrastructure 2.

5 – – 2.5 Total Directs 158.9 104.

8 4.9 268.6 7100 Field Indirects 6.

9 – 0.2 7.1 7200 Project Delivery 12.

8 – 0.3 13.1 7500 Spares + First Fills 3.

2 – 0.2 3.4 8000 Owner's Cost 4.

2 – – 4.2 Total Indirects 27.1 – 0.

7 27.8 9000 Contingency 28.9 – 0.

9 29.8 Project Total 214.9 104.

8 6.5 326.2 Sensitivity Analysis A sensitivity analysis was conducted on the base case post-tax NPV 5% and IRR of the project using the following variables: gold price, operating costs, and initial capital costs.

Table 3 summarizes the post-tax sensitivity analysis results. Table 3: Post-Tax Sensitivity Analysis Post-Tax NPV 5% Sensitivity To Opex Post-Tax IRR Sensitivity To Opex Gold Price (US$/oz) Gold Price (US$/oz) #VALUE! $1,600 $1,750 $2,200 $2,600 $3,400 Opex #VALUE! $1,600 $1,750 $2,200 $2,600 $3,400 (20.0 %) 141 210 415 597 962 (20.

0 %) 16.0 % 20.7 % 33.

3 % 43.3 % 61.7 % (10.

0 %) 97 166 372 554 919 (10.0 %) 12.8 % 17.

8 % 30.8 % 40.9 % 59.

6 % -- 53 123 329 511 876 -- 9.4 % 14.7 % 28.

2 % 38.6 % 57.4 % 10.

0 % 9 79 286 468 833 10.0 % 5.7 % 11.

4 % 25.5 % 36.2 % 55.

3 % 20.0 % -36 35 242 425 790 20.0 % 1.

9 % 7.9 % 22.7 % 33.

7 % 53.1 % Post-Tax NPV Sensitivity To Initial Capex Post-Tax IRR Sensitivity To Initial Capex Gold Price (US$/oz) Gold Price (US$/oz) #VALUE! $1,600 $1,750 $2,200 $2,600 $3,400 Initial Capex #VALUE! $1,600 $1,750 $2,200 $2,600 $3,400 (20.0 %) 97 166 373 555 919 (20.

0 %) 14.2 % 20.3 % 36.

1 % 48.3 % 70.9 % (10.

0 %) 75 145 351 533 898 (10.0 %) 11.6 % 17.

3 % 31.8 % 43.0 % 63.

5 % -- 53 123 329 511 876 -- 9.4 % 14.7 % 28.

2 % 38.6 % 57.4 % 10.

0 % 31 101 307 490 854 10.0 % 7.4 % 12.

5 % 25.2 % 34.9 % 52.

4 % 20.0 % 10 79 285 468 832 20.0 % 5.

7 % 10.5 % 22.6 % 31.

7 % 48.2 % Qualified Persons and Technical Disclosure A team of Independent Qualified Persons (as such term is defined under National Instrument 43-101 (" NI 43-101 )) at Ausenco and MMTS led the price sensitivity analysis and has reviewed and verified the technical disclosure in this press release. The team of Independent Qualified Persons, includes: Kevin Murray , P.

Eng., an independent Qualified Person at Ausenco, reviewed and verified the process and infrastructure capital and operating cost estimation, and project financials; and Marc Schulte , P.Eng.

, an independent Qualified Person at MMTS, reviewed and verified the mine planning and cost estimation. The scientific and technical information in this news release has been reviewed and verified by Dean Besserer , P.Geo.

, Vice-President of Exploration of the Company and Qualified Person as defined in NI 43-101. The updated sensitivity analysis in respect of the PEA is preliminary in nature, it includes inferred mineral resources considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the PEA will be realized. For a discussion on the basis and the qualifications and assumptions of the sensitivity analysis, please see the PEA entitled "Lemhi Gold Project, NI 43-101 Technical Report and Preliminary Economic Assessment" dated with an effective date of October 13, 2023 , and available on SEDAR+ ( www.

sedarplus.ca ) and the Company's website ( www.freemangoldcorp.

com ). About the Company and Project Freeman Gold Corp. is a mineral exploration company focused on the development of its 100% owned Lemhi Gold property.

The Lemhi Gold Project comprises 30 square kilometres of highly prospective land, hosting a near-surface oxide gold resource. The pit constrained NI 43-101 compliant mineral resource estimate is comprised of 988,100 ounces gold (" oz Au ") at 1.0 gram per tonne (" g/t ") in 30.

02 million tonnes (Measured & Indicated) and 256,000 oz Au at 1.04 g/t Au in 7.63 million tonnes (Inferred).

The Company is focused on growing and advancing the Lemhi Gold Project towards a production decision. To date, 525 drill holes and 92,696 m of drilling has historically been completed. The recently updated price sensitivity analysis shows a PEA with an after-tax net present value (5%) of US$329 million and an internal rate of return of 28.

2% using a base case gold price of US$2,200 /oz; Average annual gold production of 75,900 oz Au for a total life-of-mine of 11.2 years payable output of 851,900 oz Au; life-of-mine cash costs of US$925 /oz Au; and, all-in sustaining costs of US$1,105 /oz Au using an initial capital expenditure of US$215 million . On Behalf of the Company Bassam Moubarak Chief Executive Officer Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements: This press release contains "forward‐looking information or statements" within the meaning of Canadian securities laws, which may include, but are not limited to, all statements related to the PEA, statements relating to exploration, results therefrom, and the Company's future business plans, and statements regarding the price sensitivity analysis and impact thereof on the evaluation of the Project's economic potential. All statements in this release, other than statements of historical facts that address events or developments that the Company expects to occur, are forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects," "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur.

Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ from those in the forward-looking statements. Such forward-looking information reflects the Company's views with respect to future events and is subject to risks, uncertainties, and assumptions. The reader is urged to refer to the Company's reports, publicly available through the Canadian Securities Administrators' web-based disclosure system, SEDAR+, at www.

sedarplus.ca for a more complete discussion of such risk factors and their potential effects. The Company does not undertake to update forward‐looking statements or forward‐looking information, except as required by law.

SOURCE Freeman Gold Corp. View original content to download multimedia: http://www.newswire.

ca/en/releases/archive/April2025/09/c6311.html © 2025 Benzinga.com.

Benzinga does not provide investment advice. All rights reserved..