Central Iron Ore Limited: Drilling Results Finalised

VANCOUVER, British Columbia, Sept. 18, 2024 (GLOBE NEWSWIRE) -- Central Iron Ore Limited (CIO – TSX.V) (“CIO” or “the Company”) is pleased to announce this Drilling Update.

featured-image

VANCOUVER, British Columbia, Sept. 18, 2024 (GLOBE NEWSWIRE) -- Central Iron Ore Limited (CIO – TSX.V) (“CIO” or “the Company”) is pleased to announce this Drilling Update.

Central Iron Ore is pleased to announce that the results for the 2024 Phase 1 RC drilling campaign have been finalised. Figure 1. The sun sets after the first day's drilling of the 2024 Phase 1 RC campaign at British King (M37/30) Highlights: Assay results for the 75-hole, 5 911-meter 2024 Phase 1 RC program has been received and processed.



Multiple significant intercepts exceeding has been intercepted across the target area (Table 1) some notable intercepts include; 24BKRC_004: 5m @ 20.52g/t from 110 meters 24BKRC_007: 3m @ 28.26g/t from 96 meters 24BKRC_010: 2m @ 24.

02g/t from 75 meters 24BKRC_015: 3m @ 35.61g/t from 58 meters 24BKRC_028: 7m @ 8.53g/t from 61 meters 24BKRC_017: 2m @ 2.

44g/t from 80 meters And: 1m @ 6.24g/t from 84 meters And: 2m @ 26.7g/t from 93 meters 24BKRC_028: 7m @ 8.

53g/t from 61 meters Commencing in late September, 321 metres of Diamond Drilling (6 drillholes) will twin selected RC drillholes the showed exceptional gold endowment. The diamond drillhole core will provide invaluable structural, mineralogical and metallurgical information The British King Mineral Resource is currently being updated to include the results of the recent drilling Drilling Results Interpretation of the RC drilling assay results has confirmed high grade gold mineralisation across the prospect area (Figure 3). A clear geological understanding of the ore body has been developed with gold mineralisation associated with a primary laminated bucky quartz lode with continuity for the entire 840m of strike targeted by the drilling campaign (Figure 3 to Figure 6).

Mineralisation is open down dip and along strike. Figure 2. Section plan for the 2024 Phase 1 and historical drilling Figure 3.

Pierce Point Long section of the 2024 RC results Figure 4. Section A-A': multiple significant high grade intercepts across multiple auriferous lodes have been identified Figure 5. Section B-B': multiple significant high grade intercepts have been identified Figure 6.

Section C-C': multiple significant high grade intercepts across multiple auriferous lodes have been identified Table 1. Significant Intercepts for the 2024 Phase 1 RC Campaign Diamond Drilling Commencing Soon Twinning diamond drilling of 6 selected high-grade interceptions will commence towards end September 2024 to obtain large volume, representative samples for structural, metallurgical and petrographic test work. British King Resource Update The British King Mineral Resource is currently being updated to include the results of the recent RC drilling.

The Company’s 100% owned British King Mine Area has a NI43-101 Inferred Mineral Resource of 105,000 tonnes at 6.35 g/t Au for a total of 22,400 ounces. The British King Extensions, 100% owned by the South Darlot Joint Venture in which the Company owns a 70% interest, has an NI43-101 Inferred Resource 71,000 tonnes at 5.

64 g/t Au for 12,830 ounces at a gold price of $AUD 3,000/ounce. Both Inferred Resources have a top cut of 35 g/t Au (as per NI 43-101 report dated 18/5/2023 entitled “NI43-101 Technical Report South Darlot Gold Project Updated for the 2022-2023 Exploration Western Australia”). Figure 7.

British King Mine Area and Extensions British King Project (Western Australia) The Company’s British King Project is located across the British King Mine situated on the M37/30 Mining Tenement, approximately 320km northwest of Kalgoorlie and 60km east of Leinster in Western Australia (Figure 8). Figure 8. British King Project Location QUALIFIED PERSON Mr Andrew Bewsher who is a Member of the Australian Institute of Geoscientists and has compiled the information within this report relating to the RC drilling programme.

Mr Bewsher has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity currently being undertaken to qualify as a Competent Person as defined in NI 43-101. On behalf of the Board of Directors CENTRAL IRON ORE LIMITED “David Deitz” ____________________________ David Deitz, Director/CEO For further information, please contact: www.centralironorelimited.

com Investor and Media Inquiries: Direct: +61 2 9397 7521 Email: [email protected] Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. THIS NEWS RELEASE IS NOT FOR DISTRIBUTION TO UNITED STATES SERVICES OR FOR DISSEMINATION IN THE UNITED STATES.

Cautionary Note Regarding Forward-Looking Statements This news release contains forward-looking information within the meaning of Canadian securities laws. Although the Company believes that such information is reasonable, it can give no assurance that such expectations will prove to be correct. Forward-looking information is typically identified by words such as: believe, expect, anticipate, intend, estimate, postulate and similar expressions, or are those, which, by their nature, refer to future events.

The Company cautions investors that any forward-looking information provided by the Company is not a guarantee of future results or performance, and that actual results may differ materially from those in forward looking information as a result of various factors, including, but not limited to, the state of the financial markets for the Company’s equity securities, the state of the market for iron ore or other minerals that may be produced generally, recent market volatility; variations in the nature, quality and quantity of any mineral deposits that may be located, the Company's ability to obtain any necessary permits, consents or authorizations required for its activities, to raise the necessary capital or to be fully able to implement its business strategies and other risks associated with the exploration and development of mineral properties. The reader is referred to the Company's disclosure documents for a more complete discussion of such risk factors and their potential effects, copies of which may be accessed through the Company’s page on SEDAR at www.sedar.

com . Photos accompanying this announcement are available at https://www.globenewswire.

com/NewsRoom/AttachmentNg/6e3e72f0-454a-43fc-a650-778ebbcb199b https://www.globenewswire.com/NewsRoom/AttachmentNg/29419020-fa7e-4a26-8e79-ad78cfac3dcf https://www.

globenewswire.com/NewsRoom/AttachmentNg/fd8605ea-9290-45ce-bc2b-d39a00a6b45c https://www.globenewswire.

com/NewsRoom/AttachmentNg/7bb2f8ed-3e3e-4979-ae9d-4684a0f27bad https://www.globenewswire.com/NewsRoom/AttachmentNg/b9f4590d-0957-47a6-b60a-0a7e7aec3c7b https://www.

globenewswire.com/NewsRoom/AttachmentNg/f272b219-e017-40c6-99e9-2c5cc22c7986 https://www.globenewswire.

com/NewsRoom/AttachmentNg/2d55181d-29ba-4a0b-9265-92c5fb138333 https://www.globenewswire.com/NewsRoom/AttachmentNg/782b7252-f03d-4a90-843f-83eb38dfec04 ABN: 32 072 871 133.